Pumped hydro plan reaches milestone

Pumped hydro plan reaches milestone
The govt is looking to build a pumped hydro project like one in the Czech Republic, but much bigger (Image: Deposit Photos)
Ian Llewellyn
Contractors have been hired by the government to look at the feasibility of the $4 billion-plus Lake Onslow pumped hydro project.Energy minister Megan Woods said it marked a major milestone in the project which has caused considerable debate in the sector.The consortium, Te Rōpū Matatau, will be led by engineering consultancy Mott MacDonald New Zealand, with engineering consultancy firm GHD, and environmental planning and design consultancy Boffa Miskell.The contract is worth about $11.5 million“The first part of this investigation will l...

More Policy

How to discourage wealth
Economy

Simon Robertson: How to discourage wealth

Let NZers invest $1 offshore without making the starting point 95c every year.

Simon Robertson 20 Apr 2024
Sniffing the breeze on the next four months
Economy

Pattrick Smellie: Sniffing the breeze on the next four months

A soon-to-be international absconder ponders what he'll find on return to NZ.

Pattrick Smellie 19 Apr 2024
Aukus pillar 2 a smokescreen for N-subs: ex-Oz foreign minister
Policy

Aukus pillar 2 a smokescreen for N-subs: ex-Oz foreign minister

Bob Carr says notion of tech role for New Zealand is “science fiction”.

Pattrick Smellie 18 Apr 2024
Aged care sector under 'extreme pressure', report details
Policy

Aged care sector under 'extreme pressure', report details

Report warns NZ's aged care sector could be short by 2032. 

Gregor Thompson 17 Apr 2024