Auckland Airport staff drained terminal in three hours

Auckland Airport staff drained terminal in three hours
(Image: Supplied)
Rebecca Howard
It only took Auckland Airport three hours to safely drain one metre of flooding in and around the international terminal and work is under way to prevent any further flooding damage in the future.“This was an exceptional response in very difficult circumstances,” an Auckland Airport spokesperson said.The unprecedented rainfall shut down both the domestic and international terminals for arriving and departing aircraft and passengers posted videos of people wading through water well over their knees, floating suitcases, scores of stra...

More Infrastructure

Leighs opts out of Scott Base build
Infrastructure

Leighs opts out of Scott Base build

The Antarctic contractor is focused on offices, healthcare and apartments.

Two housing projects snare first fast-track panels
Policy

Two housing projects snare first fast-track panels

Applications opened on Feb 7. Now we have our first panels.

Oliver Lewis 08 May 2025
Methanex secures winter electricity supply again
Infrastructure

Methanex secures winter electricity supply again

Electricity generators are anxious to avoid winter power price spikes.

Pattrick Smellie 08 May 2025
Transpower proposes $1.4b replacement for ageing Cook Strait electricity cables
Infrastructure

Transpower proposes $1.4b replacement for ageing Cook Strait electricity cables

Transpower is proposing a $1.4 billion spend on replacing the ageing electricity cables linking the North and South Islands across the Cook Strait.The state-owned power transmission company released a consultation paper today setting out its proposals to replace key components of...

Staff reporters 07 May 2025