Auckland port suffering 'severe' congestion in Xmas lead-up

Auckland port suffering 'severe' congestion in Xmas lead-up
Brent Melville
Freight passing through the Auckland port is suffering severe congestion in the lead-up to Christmas.A Ports of Auckland union executive says the port’s move to an automated system is the root cause of its failure to cope with increasing volumes after weeks of industrial action in Sydney disrupted supply lines.However, the port disputes that.The “severe congestion”, which resulted in a surge of import and export cargo volumes diverted through the Port of Tauranga, has also overwhelmed rail links between Tauranga and Auckland i...

More Infrastructure

Court allows Port of Tauranga fast-track panel to proceed
Infrastructure

Court allows Port of Tauranga fast-track panel to proceed

Bay of Plenty hapū had been seeking interim relief as part of judicial review.

Oliver Lewis 25 Jul 2025
Northland targets $60b regional economy by 2050
Primary Sector

Northland targets $60b regional economy by 2050

The bullish goal represents a six-fold increase over 2024 figures.

Oliver Lewis 24 Jul 2025
Fast-track legal fight over Tauranga wharf extension
Policy

Fast-track legal fight over Tauranga wharf extension

Bay of Plenty hapū seek High Court intervention to stop expert panel being set up.

Oliver Lewis 23 Jul 2025
Contractor costs climb as Scott Base spend tops $143m
Policy

Contractor costs climb as Scott Base spend tops $143m

Antarctica NZ spent $9.3m on contractors in five months this year.

Oliver Lewis 21 Jul 2025