Hawke's Bay expressway costs put at $850m-$1.2b

Hawke's Bay expressway costs put at $850m-$1.2b
The Government is committed to widening the existing Hawke's Bay expressway. (Image: NZME)
Oliver Lewis
The Hawke’s Bay expressway could cost between $850 million and $1.2 billion, according to an estimate provided to potential suppliers – a figure that aligns exactly with documents leaked to the NZ Herald.BusinessDesk sought an explanation from the New Zealand Transport Agency (NZTA) for why the range disclosed in tender documents differed from publicly available figures in the State Highway Investment Proposal (SHIP) released in April.That document (which uses $ symbols to indicate different estimated cost ranges) said the expresswa...

More Infrastructure

InfraComm flagged concerns over transport budget
Infrastructure

InfraComm flagged concerns over transport budget

Agency took issue with how roads of national significance were prioritised. 

Oliver Lewis 04 Nov 2024
Govt may make further changes to fast-track bill
Infrastructure

Govt may make further changes to fast-track bill

Shane Jones says ministers have to be sure fast-track will be fast.

Ian Llewellyn 04 Nov 2024
Keith Turner staying as Transpower chair to May
Infrastructure

Keith Turner staying as Transpower chair to May

The 75-year-old energy sector veteran hopes for more time for fishing next year.

Ian Llewellyn 31 Oct 2024
NZTA board discusses Wellington mega-tunnel at critical meeting
Infrastructure

NZTA board discusses Wellington mega-tunnel at critical meeting

Transport Agency on the cusp of announcing its preferred tunnel option.

Oliver Lewis 31 Oct 2024