NZTA shares 'emerging preferred corridor' for multi-billion-dollar Northland expressway

NZTA shares 'emerging preferred corridor' for multi-billion-dollar Northland expressway
The Northland expressway will connect in to the existing Pūhoi to Warkworth highway. (Image: NX2)
Oliver Lewis
Transport officials have shared an early preferred route for the remainder of the Northland expressway, one of the single largest transport projects in New Zealand.The 100-kilometre corridor connecting Whangārei and Auckland has been broken into three sections: Warkworth to Te Hana, Te Hana to Port Marsden Highway, including an alternative to the current slip-prone Brynderwyns section of State Highway 1, and Port Marsden Highway to Whangārei.The NZ Transport Agency (NZTA) hasn’t released recent costings for the full corridor, but said las...

More Infrastructure

Goodman Property looks to full-year earnings growth
Infrastructure

Goodman Property looks to full-year earnings growth

The REIT lifts interim profit, as well as per-unit earnings and net tangible assets.

The back-to-front ferry deal
Opinion

Pattrick Smellie: The back-to-front ferry deal

Will the wharves be ready when the new ferries arrive?

Final Cook Strait ferry costs unveiled
Infrastructure

Final Cook Strait ferry costs unveiled

Costs and contracts for port infrastructure are still required.

Pattrick Smellie 19 Nov 2025
‘No new era of abundant gas’: BCG urges broader response
Infrastructure

‘No new era of abundant gas’: BCG urges broader response

“There is no silver bullet ... The challenge is doing all of it, fast.”

Ian Llewellyn 19 Nov 2025