Oil ship to stay at Tui field - High Court

Oil ship to stay at Tui field - High Court
Gavin Evans
BW Offshore has lost its bid to disconnect its floating production and storage vessel from the Tui oil field and clear the area before the onset of winter.Last month, the Environment Court ruled that the prospect of the FPSO Umuroa remaining at Tui over winter, unmanned, potentially uninsured, and with 40,000 barrels of oil aboard, was more of an environmental risk than allowing the firm to follow a 2017 plan to disconnect the ship from the field’s production and mooring lines and depart.But the High Court, after an urgent appeal heard yesterda...

More Infrastructure

Tonkin and Taylor announce Vanessa Stoddart as chair
Infrastructure

Tonkin and Taylor announce Vanessa Stoddart as chair

Stoddard is a director of the Channel Infrastructure board.

Arise Winston, minister of railways
Policy Analysis

Arise Winston, minister of railways

The NZ First leader has regained ministerial oversight over KiwiRail.

Govt unveils ferry plans
Infrastructure

Govt unveils ferry plans

NZ will get two new ferries, which are expected to start operations in 2029.

Oliver Lewis 11 Dec 2024