'Almost limitless cost increases': InfraComm on light rail

'Almost limitless cost increases': InfraComm on light rail
The coalition government cancelled Auckland's light rail. (Image: ALR)
Oliver Lewis
The New Zealand Infrastructure Commission delivered scathing advice about the now cancelled Auckland light rail project, suggesting decision-makers had succumbed to confirmation bias and produced an overly optimistic analysis of the favoured tunnelled option.The advice, released under the Official Information Act (OIA) to advocacy group Surface Light Rail, pushing for reconsideration of a cheaper surface-running option, includes a March 2022 document setting out the commission's position and its board.The position statement was produced fol...

More Policy

The cost of over-regulated banking: $10b to $14.4b a year
Finance

The cost of over-regulated banking: $10b to $14.4b a year

Critics claim a huge annual cost from 30 years of regulatory creep.

Pattrick Smellie 16 Apr 2025
Fast-track panels not out of blocks yet
Policy

Fast-track panels not out of blocks yet

The first three projects to go through the process are still waiting on panels.

Oliver Lewis 10 Apr 2025
Airfare reporting not ready for takeoff
Policy

Airfare reporting not ready for takeoff

Airport group says transparency measure should have a chilling effect on fares.

Oliver Lewis 09 Apr 2025
'The Great Privatisation': a NZ perspective
Economy

'The Great Privatisation': a NZ perspective

KPMG partner sees value in considering asset recycling to fund new infrastructure.

Oliver Lewis 09 Apr 2025