Energy-from-waste proponents face off with Nimbys

Energy-from-waste proponents face off with Nimbys
Project Kea proposal could create 30MW on to the grid. (Image: SIRRL)
Brent Melville
Opponents of a planned energy-from-waste plant in South Canterbury say the project has been poorly thought out and will poison the region’s air. South Island Resource Recovery (SIRRL) lodged its resource application for the $350 million ‘Project Kea’ plant, proposed for a 15-hectare site near Glenavy, with Environment Canterbury and the Waimate district council last September.  SIRRL, a joint venture between New Zealand's Renew Energy and China Tianying, said the plant will be able to produce about 30 megawatts o...

More Property

Goodman Property looks to full-year earnings growth
Infrastructure

Goodman Property looks to full-year earnings growth

The REIT lifts interim profit, as well as per-unit earnings and net tangible assets.

Argosy delivers strong first-half results
Economy

Argosy delivers strong first-half results

Earnings and net tangible asset value per share up. 

Andy Macdonald 19 Nov 2025
Asset Plus' first-half profit lower as Munroe Lane in focus
Economy

Asset Plus' first-half profit lower as Munroe Lane in focus

First-half net tangible assets per share down on the year. 

Andy Macdonald 19 Nov 2025
Fletcher Residential worth $850m ‘on a good day’
Infrastructure

Fletcher Residential worth $850m ‘on a good day’

Shareholders have been clear no asset sales should be on the cheap.