PALM VALLEY 12 DRILLING WEEKLY UPDATE

GENERAL
Tue, Sep 06 2022 09:11 am


The Operator (“Central”) (ASX: CTP) advises that as at 0600 hrs ACST on 5 September 2022, sidetrack operations had commenced on the P1 lateral section of the Palm Valley 12 (PV12) well in OL3, Southwest of Alice Springs in the Northern Territory. At this time, the sidetrack was at a measured depth of 1,428m having successfully drilled 97m of the 8.5” section. This intermediate build section of the sidetrack is expected to be completed at a measured depth of 1860m, after which a 7” liner is intended to be set in preparation for drilling of the 6” open hole section in the P1.
The P1 formation is the currently producing formation at Palm Valley. A successful PV12 lateral in the P1 formation will be tied into existing production facilities and gas production sold into strong Northern Territory and east coast gas markets.
The PV12 ST2 well is being drilled under a joint venture between Central (50% interest), New Zealand Oil & Gas Limited (ASX: NZO) (35% interest) and Cue Energy Resources Limited (ASX: CUE) (15% interest).

For further information please contact the Company on:
email [email protected]
phone +64 4 495 2424



Announcement PDF


Markets News

NZX lifts 0.2% as markets wait for US Fed decision
Markets Market Close

NZX lifts 0.2% as markets wait for US Fed decision

The S&P/NZX 50 gained 0.2% to 13,234.89 points on Tuesday.

Gregor Thompson 16 Sep 2025
Property

Oceania forecasts sales lift as it targets debt

It said sales applications had lifted 23% between July and August.

Gregor Thompson 16 Sep 2025
Oceania forecasts sales lift as it targets debt
Markets

New structure, powers for ComCom

Groceries, aviation, building supplies, digital services carparking all get a mention.

Pattrick Smellie 16 Sep 2025
New structure, powers for ComCom