Amended Appendix 3B

OFFER
Thu, Jun 08 2023 10:53 am

Infratil Limited provides the attached amended Appendix 3B including details of the Placement.


Announcement PDF


Markets News

Contact Energy lodges fast-track application for windfarm
Infrastructure

Contact Energy lodges fast-track application for windfarm

The Southland project was rejected under a different fast-track process six months ago.

Markets

Analysts cautious after KMD Brands strategic reset

Analysts say the operating backdrop remains challenging. 

Analysts cautious after KMD Brands strategic reset
Markets

Eden Bradfield: Why does NZ suck at building brands

Let the French have Fonterra brands, Eden Bradfield writes.

Eden Bradfield 06 Sep 2025
Why does NZ suck at building brands