Asteron Centre is a 'poor seismic performer' - engineer

Asteron Centre is a 'poor seismic performer' - engineer
Moving out? Structural questions at Asteron (Image: Supplied)
Brent Melville
Sending home more than 1,500 workers from Wellington’s biggest office building is symptomatic of New Zealand's continued use of pre-cast concrete flooring, structural engineers said.Last week, the Asteron Centre offices of Inland Revenue, Civil Aviation Authority, Aviation Security and Asteron Life were closed after a detailed seismic assessment (DSA) reported the new building standard (NBS) rating at a “lower level than previously assessed,” the IRD said.The government agencies and insurance firm, which take up nine floor...

More Infrastructure

KiwiRail CEO on getting it match fit, chasing freight volumes
Infrastructure

KiwiRail CEO on getting it match fit, chasing freight volumes

It comes as Rail Minister Winston Peters warns waste won't be tolerated. 

Oliver Lewis 03 Jun 2025
Hopes MMH delisting will help rail line get built
Infrastructure

Hopes MMH delisting will help rail line get built

Crawford says a rail link to Northport is crucial for the port's growth.

Dileepa Fonseka 30 May 2025
Govt announces 'farmer-focused' RMA reforms
Primary Sector

Govt announces 'farmer-focused' RMA reforms

Proposed reforms cover freshwater, farming practice, mining and quarrying.

Pattrick Smellie 29 May 2025