Asteron Centre is a 'poor seismic performer' - engineer

Asteron Centre is a 'poor seismic performer' - engineer
Moving out? Structural questions at Asteron (Image: Supplied)
Brent Melville
Sending home more than 1,500 workers from Wellington’s biggest office building is symptomatic of New Zealand's continued use of pre-cast concrete flooring, structural engineers said.Last week, the Asteron Centre offices of Inland Revenue, Civil Aviation Authority, Aviation Security and Asteron Life were closed after a detailed seismic assessment (DSA) reported the new building standard (NBS) rating at a “lower level than previously assessed,” the IRD said.The government agencies and insurance firm, which take up nine floor...

More Infrastructure

The Great Expectations on Kāinga Ora and KiwiRail
Policy

The Great Expectations on Kāinga Ora and KiwiRail

The Government is continuing to refresh boards and fire up expectations.

Port of Tauranga a 'slow follower' on price hikes
Infrastructure

Port of Tauranga a 'slow follower' on price hikes

Forsyth Barr has upgraded its outlook from 'neutral' to 'outperform'.

Manukau Harbour port study takes its sweet time
Infrastructure

Manukau Harbour port study takes its sweet time

Winston called it ludicrous. Now it's late.

Oliver Lewis 02 Jul 2024