Beach Energy delays South Island drilling

Beach Energy delays South Island drilling
Gavin Evans
Beach Energy has delayed its planned drilling off the North Otago coast amid a global slowdown in industry spending and as covid-19 border controls restrict international movement of specialist tradespeople. The firm, currently seeking consents from the Environmental Protection Authority for the programme, now expects the drilling to take place in the third quarter of 2021. It had earlier indicated the work could get underway later this year or early 2021. Adelaide-based Beach has a string of producing assets in Australia and off its coas...

More Infrastructure

The Great Expectations on Kāinga Ora and KiwiRail
Policy

The Great Expectations on Kāinga Ora and KiwiRail

The Government is continuing to refresh boards and fire up expectations.

Dileepa Fonseka 03 Jul 2024
Port of Tauranga a 'slow follower' on price hikes
Infrastructure

Port of Tauranga a 'slow follower' on price hikes

Forsyth Barr has upgraded its outlook from 'neutral' to 'outperform'.

Oliver Lewis 03 Jul 2024
Manukau Harbour port study takes its sweet time
Infrastructure

Manukau Harbour port study takes its sweet time

Winston called it ludicrous. Now it's late.

Oliver Lewis 02 Jul 2024