Onslow a bid to redesign power market - Fonterra's Whineray

Onslow a bid to redesign power market - Fonterra's Whineray
Gavin Evans
The pumped hydro scheme being proposed by the government is a bid to redesign the electricity market and risks putting dry-year risk management back in the hands of one agency, Fonterra chief operating officer Fraser Whineray says.Whineray, previously chief executive of power retailer Mercury NZ, said if the government had concerns about the ability of the market to provide secure power supplies from an increasingly renewable generation it should focus on that. In the meantime, the uncertainty it is creating is slowing investment, he said&...

More Infrastructure

The Great Expectations on Kāinga Ora and KiwiRail
Policy

The Great Expectations on Kāinga Ora and KiwiRail

The Government is continuing to refresh boards and fire up expectations.

Dileepa Fonseka 03 Jul 2024
Port of Tauranga a 'slow follower' on price hikes
Infrastructure

Port of Tauranga a 'slow follower' on price hikes

Forsyth Barr has upgraded its outlook from 'neutral' to 'outperform'.

Oliver Lewis 03 Jul 2024
Manukau Harbour port study takes its sweet time
Infrastructure

Manukau Harbour port study takes its sweet time

Winston called it ludicrous. Now it's late.

Oliver Lewis 02 Jul 2024