Port of Tauranga ‘reluctantly’ doubles MetroPort rail charges, looks to recover higher KiwiRail costs

Port of Tauranga ‘reluctantly’ doubles MetroPort rail charges, looks to recover higher KiwiRail costs
MetroPort is an inland container terminal located in Onehunga, Auckland. (Image: NZME)
Oliver Lewis
Port of Tauranga is more than doubling the cost of sending a container by rail to MetroPort in Auckland as it seeks to recover costs imposed by KiwiRail.The port sent an advisory to customers on July 1 saying it would be introducing a new site-access and vehicle-booking system (VBS) fee of $135 per container from Sept 1, as well as a rail recovery charge billed directly to shipping lines.“We acknowledge that this is a significant change for our customers and we make it reluctantly,” the advisory said.“However, the current tari...

More Primary Sector

Ikea’s forest chequebook far from closed on NZ soil
Primary Sector

Ikea’s forest chequebook far from closed on NZ soil

It has spent more $600 million on 30,000 hectares so far.

US$411b on the table: will NZ claim a slice?
Primary Sector

US$411b on the table: will NZ claim a slice?

Infrastructure will be a major focus of the NZ EU Summit, but Ukraine might be too.

Dileepa Fonseka 24 Oct 2025
Fonterra windfall brings risks: ASB
Primary Sector

Fonterra windfall brings risks: ASB

Farmers will vote for the Lactalis deal on Oct 30.

Rebecca Howard 24 Oct 2025
Agritech is NZ’s future, if it acts quickly enough: BCG report
Primary Sector

Agritech is NZ’s future, if it acts quickly enough: BCG report

NZ is still ‘navel-gazing’ about its economic future.

Greg Hurrell 23 Oct 2025