PALM VALLEY 12 DRILLING UPDATE

GENERAL
Tue, Sep 20 2022 09:15 am

The Operator (“Central”) (ASX: CTP) advises that as at 0600 hrs ACST on 19 September 2022, drilling of the Palm Valley 12 (PV12) sidetrack (ST2) into the Pacoota-1 (P1) was ongoing. The well is in OL3, Southwest of Alice Springs in the Northern Territory. The drilling of the 8.5” section was completed at a depth of 1,860m. Operations are underway to run and cement the 7” liner. Drilling of the 6” open hole section in the P1 will continue once these operations are concluded.
The P1 formation is the currently producing formation at Palm Valley. A successful PV12 lateral in the P1 formation will be tied into existing production facilities and gas production sold into strong Northern Territory and East Coast gas markets.
The PV12 ST2 well is being drilled under a joint venture between Central (50% interest), New Zealand Oil & Gas Limited (ASX: NZO) (35% interest) and Cue Energy Resources Limited (ASX: CUE) (15% interest).

For further information please contact the Company on:
email [email protected]
phone +64 4 495 2424


Announcement PDF


Markets News

NZX flat after Vital announcement
Markets

NZX flat after Vital announcement

The NZX was flat, but property stocks declined more than 1%.

Graham Skellern 10 Nov 2025
Finance

Economic hedges help ANZ NZ lift annual profit

ANZ NZ styles its full-year results as solid as net-interest margin nudges higher.

Andy Macdonald 10 Nov 2025
Economic hedges help ANZ NZ lift annual profit
Markets

PaySauce shares rise as it eyes Australia

Customer numbers for micro and rural payroll firm increased 9% for six months to Sept 30.

PaySauce shares rise as it eyes Australia