NZTA recommended toll for Manawatū highway

NZTA recommended toll for Manawatū highway
A viaduct on the new untolled Manawatū Tararua Highway. (Image: NZTA)
Oliver Lewis
The New Zealand Transport Agency (NZTA) recommended tolling the new $800 million-plus Manawatū Tararua Highway, but the Government says no. The 11.5-kilometre link, due for completion next year, will replace the old Manawatū Gorge route along State Highway 3, which was permanently closed by slips in 2017.Since then, locals have had to use alternative routes, primarily Saddle Rd. On Friday, Transport Minister Simeon Brown announced a suite of changes to make it easier to toll new roads and said three new highways would be tolled when t...

More Infrastructure

Our man in Argentina
Policy

Our man in Argentina

What happens when a pescatarian goes to the home of beef?

Oliver Lewis 14 Jan 2025
Fast-track panels to be set up from Feb 7
Policy

Fast-track panels to be set up from Feb 7

Application cost details expected in coming weeks. 

Oliver Lewis 10 Jan 2025
Rail tunnel important for coal exports to reopen
Infrastructure

Rail tunnel important for coal exports to reopen

Miner Bathurst Resources suffered a financial hit from the West Coast tunnel closure.

Oliver Lewis 08 Jan 2025
Fast-tracked dry dock could be delivered in four years
Policy

Fast-tracked dry dock could be delivered in four years

A rail spur, port expansion and dry dock are all in line for fast-tracking at Northport.

Oliver Lewis 07 Jan 2025