Smelter closure not a risk to transmission pricing benefit

Smelter closure not a risk to transmission pricing benefit
Gavin Evans
Changes to the way electricity transmission costs are to be shared will benefit consumers irrespective of whether the Tiwai Point aluminium smelter closes, the Electricity Authority says. The regulator today published a final decision on how transmission will be charged for, ending a 12-year industry debate. They are expected to deliver about $1.3 billion in consumer benefits over 30 years, mostly from lowering peak-period power costs. Rob Bernau, the authority’s general manager of market design, said that a scenario of the smelter’s clos...

More Infrastructure

Auckland housing project withdrawn from fast-track
Policy

Auckland housing project withdrawn from fast-track

The developer plans to lodge a fresh application after draft decline.

150 years of infrastructure spending going ‘boom’
Infrastructure

150 years of infrastructure spending going ‘boom’

We actually spend a lot more on infrastructure than you might think.

Construction suicide costs at $1.3 billion
Infrastructure

Construction suicide costs at $1.3 billion

A survey found that almost one in five workers reported suicidal thoughts.

Chido Machingura 12 Sep 2025
F&P Healthcare one step closer to new Karaka campus
Policy

F&P Healthcare one step closer to new Karaka campus

Auckland Council has approved a request to rezone nearly 90ha going to hearings.

Oliver Lewis 12 Sep 2025