Christchurch buses sitting on $17m central city site
Infrastructure

Christchurch buses sitting on $17m central city site

CCHL has considered a range of options for the 2.7 hectare city site.

Oliver Lewis 18 Mar 2024
NZ Rapid Tests failed owing $4.6m of GST to IRD
Law & Regulation

NZ Rapid Tests failed owing $4.6m of GST to IRD

The testing company was tipped into liquidation by Bell Gully.

Oliver Lewis 15 Mar 2024
Builtsmart boosts capacity with new Feilding factory
Infrastructure

Builtsmart boosts capacity with new Feilding factory

The family-owned building company specialises in offsite manufacturing.

Oliver Lewis 14 Mar 2024
KiwiRail on the hook: ferry termination talks roll on
Infrastructure

KiwiRail on the hook: ferry termination talks roll on

Experts have reportedly briefed ministers on the wisdom of exiting empty-handed.

Oliver Lewis 12 Mar 2024